Case study:I

Client : Satya Sai Central Trust
Project : Providing potable water for West and East Godavari Districts
Length of pipe line : 225 kilometers
Size of the pipe : pe100dn90 to pe100dn200
Scope of the work : Supply, installation and commissioning of the pipeline
Duration : Two years [2006 & 2007]

The project was taken up by Bhagwan Sri Satya Sai Baba for providing drinking water to tribal areas in East and West Godavari Districts. The complexity involves in installing the pipelines in remote hilly areas of the two districts wherein the project was taken up and commissioned within scheduled time frame. The water supply is commenced to the local habitants immediately on commissioning.
 

Case study:II

Client : Steel mining and refining company
Project : Providing pipeline for carrying water and slurry
Length of pipe line : Ten Kilometers [Two Phases]
Size of the pipe : pe100dn315
Scope of the work : Supply, Installation and Commissioning of the Pipeline
Duration : Three months

The client traditionally used the metal pipeline for carrying water and slurry. The major limitation during usage of other piping such as metal was requiring to replace the pipeline very frequently and maintaining the same while in usage which was proving expensive.
 
 