Case study:I |
| Client |
: |
Satya Sai Central Trust |
| Project |
: |
Providing potable water for West and East Godavari Districts |
| Length of pipe line |
: |
225 kilometers |
| Size of the pipe |
: |
pe100dn90 to pe100dn200 |
| Scope of the work |
: |
Supply, installation and commissioning of the pipeline |
| Duration |
: |
Two years [2006 & 2007] |
|
The project was taken up by Bhagwan Sri Satya Sai Baba for providing drinking water to tribal areas in East and West Godavari Districts. The complexity involves in installing the pipelines in remote hilly areas of the two districts wherein the project was taken up and commissioned within scheduled time frame. The water supply is commenced to the local habitants immediately on commissioning. |
|
| |
Case study:II |
| Client |
: |
Steel mining and refining company |
| Project |
: |
Providing pipeline for carrying water and slurry |
| Length of pipe line |
: |
Ten Kilometers [Two Phases] |
| Size of the pipe |
: |
pe100dn315 |
| Scope of the work |
: |
Supply, Installation and Commissioning of the Pipeline |
| Duration |
: |
Three months |
|
The client traditionally used the metal pipeline for carrying water and slurry. The major limitation during usage of other piping such as metal was requiring to replace the pipeline very frequently and maintaining the same while in usage which was proving expensive. |
|
| |